Plant expansion — 17 homogeneous belts

17 homogeneous transport lines, fabricated and installed in 2 weeks.

Client: Empresa de golosinasIndustry: ConfectioneryLocation: Colombia

The challenge

A food company needed 17 homogeneous (thermoplastic) belts from scratch for a plant expansion. FDA spec, modular design, corporate colors, tight tolerances. Tight timeline: 2 weeks for installation.

Our solution

Per-product engineering (candies, gummies, chocolates). PU homogeneous belt finished in corporate colors. 17 independent assemblies built and validated. Coordinated 2-week installation with parallel commissioning.

The result

Expansion operational on time and on budget. The 17 lines deliver 2.3M kg/month of additional capacity. The client uses 3 belt suppliers; we're their favorite because 'we understand the business.'

Key metrics

Belts
17
Added capacity
2.3M kg/mes
Year-1 uptime
99.2%

GBS brought solutions we didn't ask for. They improved our designs and it shows in efficiency. They're growth partners.